Cementing applications

RotaCEM™ Rotational Cementing Technology
MultiCEM™ Integrated Cementing System

Key Industry Problems Solved

  • Poor zonal isolation due to inadequate mud displacement

  • High risk of gas migration and channeling

  • Limited ability to rotate casing during cementing

  • Inconsistent cement placement in deviated and horizontal wells

What RotaCEM Enables

  • Controlled rotation of casing during cement placement

  • Improved mud removal and cement bonding

  • Enhanced well integrity and long-term barrier performance

  • Reduced need for remedial cementing operations

Why It Is Unique

  • Purpose-built for rotation during cementing, not just deployment

  • Enables rotation across multiple stages when combined with stage tools

  • Designed for modern extended reach and complex well geometries

  • Strong fit for CCS, HPHT, and high-integrity wells

Key Industry Problems Solved

  • Complex integration of multiple tools in cementing strings

  • Limited ability to perform multi-stage cementing with rotation

  • High operational risk in long and complex wells

What MultiCEM Enables

  • Integrated system for stage cementing with rotation capability

  • Simplifies tool string design and execution

  • Supports selective rotation of each cementing stage

Why It Is Unique

  • Enables true multi-stage rotational cementing

  • Works in combination with ECPs and stage tools

  • Provides system-level solution, not just individual tools

StrokeMAX™ Reciprocation Tool

Key Industry Problems Solved

  • Limited pipe movement during cementing

  • Poor cement displacement in horizontal sections

  • Inability to combine rotation and reciprocation effectively

What StrokeMAX Enables

  • Controlled reciprocation (up/down movement) of casing

  • Improved cement placement and hole cleaning

  • Enhanced displacement efficiency in long laterals

Why It Is Unique

  • Can be combined with RotaMAX and RotaCEM for full motion control

  • Enables both rotation and reciprocation in the same system

  • Increases cementing success in extended reach wells

NESA’s solution is to place our StrokeMAX above the RotaCEM assembly. This will allow the upper part of the casing to be lifted from the wellhead after landing the casing string and cemented the first stage. StrokeMAX can also be used on long string application to secure pipe integrity to avoid parting during stimulation temperature fluctuation of your completion.

Contact NESA Energy

Need expert support with downhole technology solutions? Contact our team for technical support, sales, or business inquiries.

© 2026. All rights reserved.

HOUSTON-TEXAS | STAVANGER-NORWAY